7. Schenkel Connectors

<<Previous Next>>

Vision:

Existing roadways and an abandoned rail bed are upgraded to allow safe pedestrian and bicycle connections through the Crestwood neighborhood. The project links to an existing overpass, offering commuters and school children safe crossing over Wilkinson Blvd.


Specs:

  • Total length: 3.25 miles
  • Hard surface multi-use trail: 1.25 mile
  • Marked road with sidewalks: 1 mile
  • Bike lanes: 1 mile

Comments